What is economic reconfiguration or congestion cost reconfiguration?
Economic reconfiguration uses MISO’s topology optimization efforts to improve the efficiency and reliability of the power grid by strategically altering the network configuration. Market participants submit their economic reconfigurations due to outages or constraints, and MISO analyzes these to maximize market efficiency.  

Who can have access to economic reconfiguration studies?
To access the economic reconfiguration studies must a CEII on file and be listed on your company’s UNDA, Appendix A. The Entity Name on the CEII on file must match the Entity Name on the UNDA, Appendix A.

Where are economic reconfigurations posted?
This information is posted on the MISO Extranet.


How do you get access to the Extranet?
You will need to login to the MISO Help Center to submit a MISO Extranet access request.
The following link provides information on how to create a MISO Help Center account.
https://help.misoenergy.org/knowledgebase/article/KA-01474/en-us How to Create a Help Center Account.


How to Submit an Access Request for Restricted Content
1) Login to Help Center
2) Select My Support
3) Click Open a New Case


4) On Category from the drop-down select Request Access to Restricted Content.
5) For Type from the drop-down select Restricted Content Access Inquires.
6) In the Description box type Economic Reconfiguration
7) Click Submit.


Where do I see the economic reconfigurations once granted access?
These are posted to the MISO Extranet.


What is posted on the Extranet?
The Extranet posting reflects that an Economic Reconfiguration has been submitted, the anticipated start and end date, plus study status. Once the study is finished, it will state whether the reconfiguration has been approved or not.


What do the columns reflect?
Anticipated Start Date and Anticipated End Date – Economic reconfiguration duration
Target Constraints for Unit – Constraint targeted for economic reconfiguration
Active/New: Submitted but study has not started
Active/In progress: Submitted and under study
Resolved/Denied: Failed any part of the study process or TO denies
Resolved/Granted: Passed study process

How can I submit an economic reconfiguration for MISO to study?
1) Login to Help Center
2) Select My Support
3) Click Open a New Case



4) For Category, select Economic Reconfiguration
5) For Type, select Current Constraint or Future Constraint
6) Enter Title
7) Click
Submit

If an economic reconfiguration is approved, will the discretionary outage(s) appear for the entire period or only on the days the constraint in question is at risk?
Economic reconfigurations are not dynamically implemented based on current constraint congestion.  They are implemented at the start of the studied outage and remain for the length of the outage duration, reflected on the Extranet by the Duration Start and Duration End dates. The ultimate decision for whether or not an approved economic reconfiguration is implemented is by MISO RT Reliability Coordinators, prioritizing reliability alongside current grid conditions.

If a specific economic reconfiguration change is approved for a specific constraint/contingency listed, and a different contingency is identified in the DA/RT model, will the economic reconfiguration be used, or will it require additional analysis to determine if the new contingency is mitigated appropriately?
Economic reconfigurations are for specific monitored and contingent element pairs and cannot be used for other additional identified contingencies without an additional study.

Can we find the specific grid economic reconfiguration for each solution being analyzed?
No. The specific grid reconfiguration, such as what breakers are closing and opening, is transmission information that MISO cannot publish to everyone who could access the extranet. 