MARKETS
Asset Registration
Level 100 - Demand Response as a Resource
Level 100 - Market Participant and Asset Registration
Level 300 - Commercial Model Asset Registration
Markets Overview
Level 100 - Energy and Operating Reserves Markets
Level 200 - Energy and Operating Reserves Markets
Level 200 - Energy and Operating Reserves Market Pricing
Level 100 - Introduction to DERs
Level 200 - Integrating DERs to the Bulk Electric System
Level 200 - Integrating DERs into the Distribution System
FTR/ARR
Level 100 - Auction Revenue Rights and Financial Transmission Rights
Level 200 - ARR and FTR Course: Transmission Service Examples
Level 200 - Auction Revenue Rights and Financial Transmission Rights
Market Settlements
Level 100 - Market Settlements
Level 100 - Market Settlements Disputes
Transmission Settlements
Level 100 - Transmission Settlements
Level 100 - Transmission Pricing Attachment O
Level 200 - Transmission Settlements
Settlements Upload User Guide
Transmission Settlements Upload Overview and Demonstration (July 23, 2020)
Meter Data
Level 100 - Meter Data Training
Market Systems & Technology
MUI 2.0 Guide for Market Participants
MODELING
Modeling Overview
Level 100 - Tie Line and ICCP Data Mapping and Processing
Level 100 - Network and Commercial Model
Level 200 - Network and Commercial Model
Modeling User Guides
Modeling Schedule
Model Manager Access Guide
Model Manager Step-by-Step How-to Guide Commercial Model
Model Manager (SGEM/MAGE) General Capabilities
Model Manager Step-by-Step How-to Guide Network Model
Limits Modeling in MISO Model Manager
Allowed Production in Line MCR Changes
Double Modeling
BTM Generation Modeling Guidelines
FERC Order 881 Information
Ambient Adjusted Ratings User Guide
ICCP Modeling User Guide
V0.11 ICCP Template
How to Create New SCADA Points
881 SCADA Holders & Descriptions
FERC 881 Ratings Template Instructions
FERC 881 Ratings Import Template
FERC Order 881 MISO Model Manager Modeling Guide
OPERATIONS
Transmission Services Overview
Level 100 - Transmission Services
Level 100 - Transition from Balancing Authority to MISO Local Balancing Authority
Transmission Service Reservation (TSR) and NITS Requests
Level 100 - NITS Training Guide: Add Terminate NITS DNR
Level 100 - NITS Training Guide: DNR List
Level 100 - NITS Training Guide: NITS Application Detail
Level 100 - NITS Training Guide: NITS Application on OASIS
Level 100 - NITS Training Guide: NITS Load Designation
Level 100 - NITS Training Guide: Scheduling Rights List
Level 100 - NITS Training Guide: Tagging a Network Scheduling Right
Level 100 - NITS Training Guide - All Files
Level 200 - Long Term Transmission Service Requests
Physical Scheduling
Level 100 - Interchange Training
Real Time Dispatch and Reliability Coordination
Level 100 - Real Time Operations
Level 100 - IMM Uninstructed Deviation
Level 100 - Real-Time Offer Enhancement
Level 100 - Real-Time Offer Enhancement: DRR Type l
Level 100 - Real-Time Offer Enhancement: Generation Resource
Level 100 - Real-Time Offer Enhancement: Stored Energy Resources
Level 100 - Regional Directional Transfer (RDT) Overview
Operations Systems and Technology
CROW User Guide
CROW Training for Transmission
CROW Training for Generators
OPERATOR INTERFACE TRAINING
Operator Interface User Guide
Operator Interface Workshop #1 PowerPoint
Operator Interface Workshop #2 PowerPoint
Operator Interface Workshop #3 PowerPoint
How to Access CCE Environment
Operator Interface Demo in CCE
Operator Interface Workshop #1 Part 1
Operator Interface Workshop #1 Part 2
Operator Interface Workshop #2 Part 1
Operator Interface Workshop #2 Part 2
Operator Interface Workshop #3 Part 1
Operator Interface Workshop #3 Part 2
TRANSMISSION & GENERATION PLANNING AND RESOURCE ADEQUACY
System Modeling
Level 300 - Transmission Planning - Modeling
MISO Transmission Expansion Plan (MTEP)
MTEP Planning Portal Guide for the New Portal
Resource Adequacy
Introduction to Seasonal Accredited Capacity
Planning Reserve Auction (PRA) Basics
Level 100 - Resource Adequacy
Level 200 - Resource Adequacy
Load Modifying Resources Overview Webex Recording (October 8, 2019)
Generation Interconnection
Level 100 Generator Interconnection Process
GIA Portal User Guide
GIA Portal User Guide for TO Reviewers
Generator Interconnection Agreement Training
Generation Interconnection Queue Process Workshop
POI Tool Workshop
Planning Systems and Technology
Level 300 - Transmission Planning - Model on Demand
STAKEHOLDER GOVERNANCE
Targeted Training by Type
Level 100 - Stakeholder Process and Website Tutorials
Level 100 - Introduction to Stakeholder Process Participation
Level 100 - MISO's Issue Submission Process
Level 200 - Introduction to Stakeholder Governance
Level 200 - Advisory Committee Training
Level 300 - Entity Leadership Training
Level 300 - Entity Leadership Non-Sector Voting Process Training
Alternate Dispute Resolution Committee (ADRC) Member Training
Stakeholder Governance Systems and Technology
Link to Feedback Tool
Link to MISO Dashboard (Issue Tracking Tool)
GENERAL CURRICULUM
Level 100 - Introduction to MISO
Level 100 - How to Subscribe to a MISO Mailing List
MISO Help Center Online Guide
Local Security Administrator Training

